Infrastructure, planning and the command of time

Tim Marshall & Richard Cowell

Environment and Planning C: politics and space2016https://doi.org/10.1177/0263774x16642768article
AJG 3ABDC B
Weight
0.74

Abstract

Governments in many countries have sought to accelerate the time taken to make decisions on major infrastructure projects, citing problems of ‘delay’. Despite this, rarely has the time variable been given careful empirical or conceptual attention in decision-making generally, or in infrastructure decision-making specifically. This paper addresses this deficit by analysing decision-making on two categories of major infrastructure in the UK – transport and electricity generation – seeking both to generate better evidence of the changes to decision times in recent decades, and to generate insights from treating time as resource and tracking its (re)allocation. We find that reforms introduced since 2008 have done relatively little to alter overall decision times, but that there are marked and revealing changes to the allocation of time between decision-making stages. While public planning processes have their time frames tightly regulated, aspects led by developers (e.g. pre-application discussion) are not; arranging finance can have a bigger effect on project time frames, and central government retains much flexibility to manage the flow of time. Speed-up reforms are also sectorally uneven in their reach. This indicates how arguments for time discipline falter in the face of infrastructure projects that remain profoundly politicised.

38 citations

Open via your library →

Cite this paper

https://doi.org/https://doi.org/10.1177/0263774x16642768

Or copy a formatted citation

@article{tim2016,
  title        = {{Infrastructure, planning and the command of time}},
  author       = {Tim Marshall & Richard Cowell},
  journal      = {Environment and Planning C: politics and space},
  year         = {2016},
  doi          = {https://doi.org/https://doi.org/10.1177/0263774x16642768},
}

Paste directly into BibTeX, Zotero, or your reference manager.

Flag this paper

Infrastructure, planning and the command of time

Flags are reviewed by the Arbiter methodology team within 5 business days.


Evidence weight

0.74

Balanced mode · F 0.40 / M 0.15 / V 0.05 / R 0.40

F · citation impact1.00 × 0.4 = 0.40
M · momentum0.78 × 0.15 = 0.12
V · venue signal0.50 × 0.05 = 0.03
R · text relevance †0.50 × 0.4 = 0.20

† Text relevance is estimated at 0.50 on the detail page — for your query’s actual relevance score, open this paper from a search result.