A solution framework for multi-skilled project scheduling problems with hierarchical skills

Jakob Snauwaert & Mario Vanhoucke

Journal of Scheduling2025https://doi.org/10.1007/s10951-025-00836-1article
AJG 1ABDC B
Weight
0.52

What the paper says

Abstract Multi-skilled project scheduling concerns the assignment of multi-skilled resources to activities and the scheduling of these activities in order to minimise the project makespan. Since the resources in these problems can be discerned based on their mastered categorical skills, they are considered to be individual entities (human beings) rather than a general class or type of resources. Therefore, researchers have been looking into multi-skilled resources to investigate which other characteristics differentiate them from one another. A main line of research in the last years studies the incorporation of hierarchical skills and their impact on the decision-making in scheduling problems. Hierarchical skills indicate the level at which resources can perform their different skills. In this paper, we present six multi-skilled resource-constrained project scheduling problems with hierarchical skills. In each of these problems, the hierarchical skills have a different impact on the project and its objectives. Solutions are constructed using a solution framework where new problem-specific local searches are embedded in a genetic algorithm. This new framework is tested on existing data from the literature. Computational experiments compare the quality of the solution approaches and the local searches to an integer programming solver. Furthermore, the principal features and tendencies of each problem are discussed. Finally, best-known solutions and lower bounds for all presented problems will be provided.

7 citations

Open paper page →

Cite this paper

https://doi.org/https://doi.org/10.1007/s10951-025-00836-1

Or copy a formatted citation

@article{jakob2025,
  title        = {{A solution framework for multi-skilled project scheduling problems with hierarchical skills}},
  author       = {Jakob Snauwaert & Mario Vanhoucke},
  journal      = {Journal of Scheduling},
  year         = {2025},
  doi          = {https://doi.org/https://doi.org/10.1007/s10951-025-00836-1},
}

Paste directly into BibTeX, Zotero, or your reference manager.

Flag this paper

A solution framework for multi-skilled project scheduling problems with hierarchical skills

Flags are reviewed by the Arbiter methodology team within 5 business days.


Evidence weight

0.52

Balanced mode · F 0.40 / M 0.15 / V 0.05 / R 0.40

F · citation impact0.47 × 0.4 = 0.19
M · momentum0.68 × 0.15 = 0.10
V · venue signal0.50 × 0.05 = 0.03
R · text relevance †0.50 × 0.4 = 0.20

† Text relevance is estimated at 0.50 on the detail page — for your query’s actual relevance score, open this paper from a search result.