Cite this paper https://doi.org/https://doi.org/10.1080/01446193.2026.2648601 Copy URL
Or copy a formatted citation
BibTeX RIS APA Chicago Link
@article{saad2026,
title = {{Interactions of factors affecting the implementation of Integrated Project Delivery in the New Zealand construction industry: a system dynamics and network analysis approach}},
author = {Saad Bin Asad et al.},
journal = {Construction Management and Economics},
year = {2026},
doi = {https://doi.org/https://doi.org/10.1080/01446193.2026.2648601},
} TY - JOUR
TI - Interactions of factors affecting the implementation of Integrated Project Delivery in the New Zealand construction industry: a system dynamics and network analysis approach
AU - al., Saad Bin Asad et
JO - Construction Management and Economics
PY - 2026
ER - Saad Bin Asad et al. (2026). Interactions of factors affecting the implementation of Integrated Project Delivery in the New Zealand construction industry: a system dynamics and network analysis approach. *Construction Management and Economics*. https://doi.org/https://doi.org/10.1080/01446193.2026.2648601 Saad Bin Asad et al.. "Interactions of factors affecting the implementation of Integrated Project Delivery in the New Zealand construction industry: a system dynamics and network analysis approach." *Construction Management and Economics* (2026). https://doi.org/https://doi.org/10.1080/01446193.2026.2648601. Interactions of factors affecting the implementation of Integrated Project Delivery in the New Zealand construction industry: a system dynamics and network analysis approach
Saad Bin Asad et al. · Construction Management and Economics · 2026
https://doi.org/https://doi.org/10.1080/01446193.2026.2648601 Copy
Paste directly into BibTeX, Zotero, or your reference manager.