Cite this paper
https://doi.org/https://doi.org/10.1061/jcemd4.coeng-17359
Or copy a formatted citation
@article{piyush2026,
title = {{Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects}},
author = {Piyush et al.},
journal = {Journal of Construction Engineering and Management},
year = {2026},
doi = {https://doi.org/https://doi.org/10.1061/jcemd4.coeng-17359},
}TY - JOUR
TI - Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects
AU - al., Piyush et
JO - Journal of Construction Engineering and Management
PY - 2026
ER -
Piyush et al. (2026). Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects. *Journal of Construction Engineering and Management*. https://doi.org/https://doi.org/10.1061/jcemd4.coeng-17359
Piyush et al.. "Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects." *Journal of Construction Engineering and Management* (2026). https://doi.org/https://doi.org/10.1061/jcemd4.coeng-17359.
Blockchain-Based Time Impact Analysis Method for Sustainable Delay Management in EPC Projects
Piyush et al. · Journal of Construction Engineering and Management · 2026
https://doi.org/https://doi.org/10.1061/jcemd4.coeng-17359
Paste directly into BibTeX, Zotero, or your reference manager.