Graph neural network model for cable tunnel cost prediction under high-dimensional construction data

Ming Fang et al.

International Journal of Innovation and Sustainable Development2026https://doi.org/10.1504/ijisd.2026.152282article
AJG 1
Weight
0.50

What the paper says

This paper focuses on the challenging problem of cable tunnel cost prediction, aiming to achieve accurate estimation with the help of advanced technology so as to improve the level of project cost management.Facing the multi-source heterogeneous data generated by cable tunnel constructioncharacterised by diverse engineering design parameters, construction techniques, and external environmental factors -traditional prediction methods are often ineffective.Therefore, a cost forecasting model based on graph neural network (GNN) is constructed.In this paper, various optimisation strategies are employed, including the use of weighted mean squared error (WMSE) as the loss function and the stochastic gradient descent (SGD) optimisation algorithm.The results indicate that this model is efficient and reliable for cable tunnel cost prediction and can provide strong support for engineering cost management in practical applications.

Open paper page →

Cite this paper

https://doi.org/https://doi.org/10.1504/ijisd.2026.152282

Or copy a formatted citation

@article{ming2026,
  title        = {{Graph neural network model for cable tunnel cost prediction under high-dimensional construction data}},
  author       = {Ming Fang et al.},
  journal      = {International Journal of Innovation and Sustainable Development},
  year         = {2026},
  doi          = {https://doi.org/https://doi.org/10.1504/ijisd.2026.152282},
}

Paste directly into BibTeX, Zotero, or your reference manager.

Flag this paper

Graph neural network model for cable tunnel cost prediction under high-dimensional construction data

Flags are reviewed by the Arbiter methodology team within 5 business days.


Evidence weight

0.50

Balanced mode · F 0.40 / M 0.15 / V 0.05 / R 0.40

F · citation impact0.50 × 0.4 = 0.20
M · momentum0.50 × 0.15 = 0.07
V · venue signal0.50 × 0.05 = 0.03
R · text relevance †0.50 × 0.4 = 0.20

† Text relevance is estimated at 0.50 on the detail page — for your query’s actual relevance score, open this paper from a search result.