Joint decision-making on production scheduling and roll change planning in hot rolling process with roll profile constraints

Shangju Hu et al.

Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture2026https://doi.org/10.1177/09544054251408542article
AJG 1
Weight
0.50

What the paper says

Decision-making related to production scheduling and roll change in hot rolling plays a crucial role in improving product quality and production efficiency. Conventional production scheduling often relies on fixed rolling lengths or slab quantities to reduce quality risks caused by roll wear, which overlooks variations in roll wear and the distinct roll profile requirements of different steel grades. To address these issues, this paper establishes a joint optimization model for production scheduling and roll change with the objective of minimizing total production costs, which include delay costs, quality costs, and roll change costs, by incorporating stochastic modeling and reliability assessment of roll wear degradation. This is done under the premise that all slabs within the same rolling unit require the same roll shape. The model comprehensively considers the quality grade requirements of different products, delivery deadlines, and the variability in roll wear. To solve this model, a multi-rule constrained dynamic adjustment factor genetic algorithm (MRCDAF-GA) is proposed. Numerical comparison experiments and sensitivity analysis using data from 431 slabs in actual production in a steel plant verified the effectiveness of the model and method. The proposed strategy achieved roll reliability between 0.867 and 0.939, reducing production costs by 6.51% compared with current practice. Furthermore, the proposed algorithm outperformed comparison algorithms in terms of convergence speed and running time.

Open paper page →

Cite this paper

https://doi.org/https://doi.org/10.1177/09544054251408542

Or copy a formatted citation

@article{shangju2026,
  title        = {{Joint decision-making on production scheduling and roll change planning in hot rolling process with roll profile constraints}},
  author       = {Shangju Hu et al.},
  journal      = {Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture},
  year         = {2026},
  doi          = {https://doi.org/https://doi.org/10.1177/09544054251408542},
}

Paste directly into BibTeX, Zotero, or your reference manager.

Flag this paper

Joint decision-making on production scheduling and roll change planning in hot rolling process with roll profile constraints

Flags are reviewed by the Arbiter methodology team within 5 business days.


Evidence weight

0.50

Balanced mode · F 0.40 / M 0.15 / V 0.05 / R 0.40

F · citation impact0.50 × 0.4 = 0.20
M · momentum0.50 × 0.15 = 0.07
V · venue signal0.50 × 0.05 = 0.03
R · text relevance †0.50 × 0.4 = 0.20

† Text relevance is estimated at 0.50 on the detail page — for your query’s actual relevance score, open this paper from a search result.