Cite this paper
https://doi.org/https://doi.org/10.1016/j.ejor.2026.02.026
Or copy a formatted citation
@article{t.2026,
title = {{Progressive hedging algorithm for the resource constrained project scheduling problem with modular production}},
author = {T. Van Der Beek et al.},
journal = {European Journal of Operational Research},
year = {2026},
doi = {https://doi.org/https://doi.org/10.1016/j.ejor.2026.02.026},
}TY - JOUR
TI - Progressive hedging algorithm for the resource constrained project scheduling problem with modular production
AU - al., T. Van Der Beek et
JO - European Journal of Operational Research
PY - 2026
ER -
T. Van Der Beek et al. (2026). Progressive hedging algorithm for the resource constrained project scheduling problem with modular production. *European Journal of Operational Research*. https://doi.org/https://doi.org/10.1016/j.ejor.2026.02.026
T. Van Der Beek et al.. "Progressive hedging algorithm for the resource constrained project scheduling problem with modular production." *European Journal of Operational Research* (2026). https://doi.org/https://doi.org/10.1016/j.ejor.2026.02.026.
Progressive hedging algorithm for the resource constrained project scheduling problem with modular production
T. Van Der Beek et al. · European Journal of Operational Research · 2026
https://doi.org/https://doi.org/10.1016/j.ejor.2026.02.026
Paste directly into BibTeX, Zotero, or your reference manager.