Cite this paper
https://doi.org/https://doi.org/10.1007/s12351-026-01034-3
Or copy a formatted citation
@article{khushbu2026,
title = {{Transient analysis and cost optimization of a machine repair system with dual-phase repair, working vacation, and retrial}},
author = {Khushbu S. Antala et al.},
journal = {Operational Research},
year = {2026},
doi = {https://doi.org/https://doi.org/10.1007/s12351-026-01034-3},
}TY - JOUR
TI - Transient analysis and cost optimization of a machine repair system with dual-phase repair, working vacation, and retrial
AU - al., Khushbu S. Antala et
JO - Operational Research
PY - 2026
ER -
Khushbu S. Antala et al. (2026). Transient analysis and cost optimization of a machine repair system with dual-phase repair, working vacation, and retrial. *Operational Research*. https://doi.org/https://doi.org/10.1007/s12351-026-01034-3
Khushbu S. Antala et al.. "Transient analysis and cost optimization of a machine repair system with dual-phase repair, working vacation, and retrial." *Operational Research* (2026). https://doi.org/https://doi.org/10.1007/s12351-026-01034-3.
Transient analysis and cost optimization of a machine repair system with dual-phase repair, working vacation, and retrial
Khushbu S. Antala et al. · Operational Research · 2026
https://doi.org/https://doi.org/10.1007/s12351-026-01034-3
Paste directly into BibTeX, Zotero, or your reference manager.