Cite this paper
https://doi.org/https://doi.org/10.1080/03155986.2025.2540236
Or copy a formatted citation
@article{ning2025,
title = {{In-house or contract out? The manufacturer’s remanufacturing modes selection under quality uncertainty}},
author = {Ning Zhang et al.},
journal = {INFOR (INFOR: Information Systems and Operational Research)},
year = {2025},
doi = {https://doi.org/https://doi.org/10.1080/03155986.2025.2540236},
}TY - JOUR
TI - In-house or contract out? The manufacturer’s remanufacturing modes selection under quality uncertainty
AU - al., Ning Zhang et
JO - INFOR (INFOR: Information Systems and Operational Research)
PY - 2025
ER -
Ning Zhang et al. (2025). In-house or contract out? The manufacturer’s remanufacturing modes selection under quality uncertainty. *INFOR (INFOR: Information Systems and Operational Research)*. https://doi.org/https://doi.org/10.1080/03155986.2025.2540236
Ning Zhang et al.. "In-house or contract out? The manufacturer’s remanufacturing modes selection under quality uncertainty." *INFOR (INFOR: Information Systems and Operational Research)* (2025). https://doi.org/https://doi.org/10.1080/03155986.2025.2540236.
In-house or contract out? The manufacturer’s remanufacturing modes selection under quality uncertainty
Ning Zhang et al. · INFOR (INFOR: Information Systems and Operational Research) · 2025
https://doi.org/https://doi.org/10.1080/03155986.2025.2540236
Paste directly into BibTeX, Zotero, or your reference manager.